Project scope before adapter scope

A sponsor's public pipeline is not the financed borrowing pool. For PowerBank / NY Green Bank, no New York adapter should be built from public project names alone.

Required before build

Production admission additionally requires the effective authoritative source/version and bounded facility-specific evidence predicates.

Public DC MW, general portfolio announcements, or a positive interconnection study do not establish facility membership, process applicability, borrowing-base eligibility, advance rate, legal status or funding status.

Public-information ceiling

PowerBank/NYGB public project-membership research is now stopped: the closing disclosure conflicts at 34 MW versus 50 MW and reviewed filing inventories expose no financed-project schedule.

See the conflict and stop rule